North Star Mall Fountain

7400 San Pedro San Antonio
Posted in

The purpose of the North Star Mall – Fountain project was to eliminate a hazard of a water feature that was no longer functioning.  The project consisted of the follwing:

 

  • Grading
  • Doweling
  • Re bar Tying
  • Concrete Pumping
  • Indoor Concrete
  • Night/Weekend work hours

The Challenge was to reach the areas of the project as it was the middle of a major mall walkway.  We were able to minimize impact by waiting until the mall was closed and ensuring we covered all work areas with moisture vapor as well as protective boards.

 

 

 

img_4201 img_4223 img_4224 img_4228 img_4230 img_4237